<h1 class="light">The Bridge Behavioral Health</h1><!-- [et_pb_line_break_holder] --><p class="subpage-center-justified light">Ayars & Ayars, Inc. was excited to be part of The Bridge Behavioral Health renovation at the Lincoln center. The renovation included work on all three levels of the recovery facility, and added a much needed kitchen to the site. This project improved living conditions immensely for those who live on site while undergoing treatment.</p>
<a href="/wp-content/uploads/2018/12/The-Bridge-Behavorial-Health.pdf" download><!-- [et_pb_line_break_holder] --><div><i class="fas fa-download"></i></div><!-- [et_pb_line_break_holder] --><div class="cta-a" style="margin-top: 0px;">Download Project Card</div><!-- [et_pb_line_break_holder] --><div class="cta-b"></div><!-- [et_pb_line_break_holder] --></a>
<a href="https://www.google.com/maps/place/The+Bridge+Behavioral+Health/@40.8088292,-96.7130613,17z/data=!3m1!4b1!4m5!3m4!1s0x8796bf06aab7ea69:0xd57d2f3db70e7e2a!8m2!3d40.8088252!4d-96.7108726"target="_blank"><!-- [et_pb_line_break_holder] --><i class="fas fa-map-marker-alt"></i><!-- [et_pb_line_break_holder] --><h2>Location</h2><!-- [et_pb_line_break_holder] -->

Lincoln, NE</p><!-- [et_pb_line_break_holder] --></a>

<a href="#"><!-- [et_pb_line_break_holder] --><i class="fas fa-building"></i><!-- [et_pb_line_break_holder] --><h2>Type</h2><!-- [et_pb_line_break_holder] -->

Interior Remodel</p><!-- [et_pb_line_break_holder] --></a>

<a href="#"><!-- [et_pb_line_break_holder] --><i class="fas fa-check-circle"></i><!-- [et_pb_line_break_holder] --><h2>Completed</h2><!-- [et_pb_line_break_holder] -->

2016</p><!-- [et_pb_line_break_holder] --></a>

<a href="#"><!-- [et_pb_line_break_holder] --><i class="fas fa-external-link-square-alt"></i><!-- [et_pb_line_break_holder] --><h2>Size</h2><!-- [et_pb_line_break_holder] -->

51,000 sq. ft.</p><!-- [et_pb_line_break_holder] --></a>

The Bridge Behavioral Health

“ Ayars & Ayars made sure they could meet every promise they made from scheduling to completion. During the project, we always felt as though we were aware of the problems involved, and their solutions. In the end we now have a building that meets our needs both now and into the foreseeable future. ”

Phil Tegeler

Executive Director

<span class="divider"></span>
<h4>Search All Projects</h4>
<span class="divider"></span>