Lincoln Electrical Systems - Gray Water Cooling Station

Ayars & Ayars, Inc. was happy to be selected as the subcontractor for general construction throughout the project at the LES Gray Water Cooling Station. Ayars & Ayars, Inc. provided the piping for the water supply, the wastewater pits, buildings, the meter vault, and the installation of a 4' x 20' curb with a removable top at the Water Supply Building.

Search All Projects